13-01-2022, 10:07 PM
These are photos of our Joggle in 1992
For anyone brave enough to do the Joggle in 2022 please contact Peter Hales at swa7csecretary@gmail.com
Exiting the train from Crew to Inverness
Ruby leaving Train.pdf (Size: 64.09 KB / Downloads: 40)
Brora pitstop to change crank and araldite patch on crankcase
Joggle Pitstop.pdf (Size: 56.57 KB / Downloads: 32)
An engine. less than 20 hours to the start line closes
Joggle Engine.pdf (Size: 86.82 KB / Downloads: 40)
Half a crank
Joggle broken crank.pdf (Size: 63.53 KB / Downloads: 34)
The start
Joggle start.pdf (Size: 66.36 KB / Downloads: 30)
The Finish
Joggle finish.pdf (Size: 58.23 KB / Downloads: 30)
For anyone brave enough to do the Joggle in 2022 please contact Peter Hales at swa7csecretary@gmail.com
Exiting the train from Crew to Inverness

Brora pitstop to change crank and araldite patch on crankcase

An engine. less than 20 hours to the start line closes

Half a crank

The start

The Finish
