24-10-2020, 09:11 PM
Bit more of an update. The aluminium skin is being formed and welded. Those with a keen eye will note that the sides are one sheet not two. This was decided as it makes life a lot easier and is a bit more manageable when it comes to welding. Especially as I am new to all of this. Hopefully in the next few weeks it should be fitted on to the floor and the final finishing stage can begin. However, still lots to do... wiring, planishing and minor adjustments.. etc
20200925_123623.jpg (Size: 144.32 KB / Downloads: 624)
20200925_184212.jpg (Size: 163.03 KB / Downloads: 625)
20201002_152115.jpg (Size: 156.56 KB / Downloads: 624)
20201009_145909.jpg (Size: 168.04 KB / Downloads: 625)
20201009_145931.jpg (Size: 180.7 KB / Downloads: 625)
20200925_123623.jpg (Size: 144.32 KB / Downloads: 624)
20200925_184212.jpg (Size: 163.03 KB / Downloads: 625)
20201002_152115.jpg (Size: 156.56 KB / Downloads: 624)
20201009_145909.jpg (Size: 168.04 KB / Downloads: 625)
20201009_145931.jpg (Size: 180.7 KB / Downloads: 625)