22-07-2020, 11:30 AM
(This post was last modified: 22-07-2020, 11:44 AM by Geoff Halstead.)
Hello Ruairidh,
Can only manage using clamps at the moment as both inner arches have had the same treatment as Mud Shields with same amount if filler - 4lbs total!
Will bend up a length of sheet metal to match inner arch then lay it over the bodge on NS Mud Shield to check how it fits.
Wonder if the repairs done have shrunk the metal to such a degree, hence my thought of cutting them out as I’ve nothing to loose right now, and easy to do.
Ivor,
Correct.
See my reply to Ruairidh.
I had pieces of metal cut ready to do so last year, as well for the inner arches.
Will now do both as they need fixing so that I can check the fit of Running Boards and front Mud Shields as well as trimming to length the NS B-post outer repair.
Can only manage using clamps at the moment as both inner arches have had the same treatment as Mud Shields with same amount if filler - 4lbs total!
Will bend up a length of sheet metal to match inner arch then lay it over the bodge on NS Mud Shield to check how it fits.
Wonder if the repairs done have shrunk the metal to such a degree, hence my thought of cutting them out as I’ve nothing to loose right now, and easy to do.
Ivor,
Correct.
See my reply to Ruairidh.
I had pieces of metal cut ready to do so last year, as well for the inner arches.
Will now do both as they need fixing so that I can check the fit of Running Boards and front Mud Shields as well as trimming to length the NS B-post outer repair.