05-12-2019, 07:14 PM
(This post was last modified: 05-12-2019, 07:17 PM by Tony Betts.)
Whilst I'm waiting for paint to dry on the doors and frame, with two coats of primer and two top coats. Is going to take forever.
Thought I'd start on the ceiling joists, thought I'd drop it down by 3 inches to avoid the wires.
A ceiling will hopefully hold some heat in, and keep dust down from the workshop.
Tony.
[attachment=8297]
I am a bit worried about fitting the ceiling now, as the boards are 4 foot x 8 foot.
And heavy?
There are 3 full sheets to go up, plus smaller cuts.
Ceiling height 7 foot
Tony.
Thought I'd start on the ceiling joists, thought I'd drop it down by 3 inches to avoid the wires.
A ceiling will hopefully hold some heat in, and keep dust down from the workshop.
Tony.
[attachment=8297]
I am a bit worried about fitting the ceiling now, as the boards are 4 foot x 8 foot.
And heavy?
There are 3 full sheets to go up, plus smaller cuts.
Ceiling height 7 foot
Tony.