Valance:
Only the side flanges needed replacing.
Geoff - Two posts to go
Mud Shield brackets:
No repairs needed, just a long session in the sandblasting cabinet getting rid of the caked on gunk and rust.
Geoff - Nearly done for today.
Mud Shields, Brackets and Valance given a coat of zinc epoxy primer.
They both need a little filler as it was my first attempt at anything like this, so left a little to be desired, but what the heck, still chuffed.
Geoff - Caught up with posting at last.
Only the side flanges needed replacing.
Geoff - Two posts to go
Mud Shield brackets:
No repairs needed, just a long session in the sandblasting cabinet getting rid of the caked on gunk and rust.
Geoff - Nearly done for today.
Mud Shields, Brackets and Valance given a coat of zinc epoxy primer.
They both need a little filler as it was my first attempt at anything like this, so left a little to be desired, but what the heck, still chuffed.
Geoff - Caught up with posting at last.