03-09-2018, 01:19 PM
Plan A no good. The chain to operate the block would have been 15 foot in the air. Besides it weight nearly 1cwt. Carrying it up the ladder was too difficult.
Have now sorted plan B. A block hung on the roof. And a terfor anchored to the shed wall (steelwork). The lift can now be accomplished from the (relative) safety of the ground
Have now sorted plan B. A block hung on the roof. And a terfor anchored to the shed wall (steelwork). The lift can now be accomplished from the (relative) safety of the ground