Thank you Howard. It's nice to be missed.
What with saving up for all the bits and three weeks lead time to get the block bored (but at £120.00 cash, it was not expensive and was thus worth the wait), plus the fact that the garage is not the most pleasant place in winter and plays Old Harry with the arthritis and the chest,the job took longer than originally anticipated. Anyway, it's done now and ready for the nicer weather.
What with saving up for all the bits and three weeks lead time to get the block bored (but at £120.00 cash, it was not expensive and was thus worth the wait), plus the fact that the garage is not the most pleasant place in winter and plays Old Harry with the arthritis and the chest,the job took longer than originally anticipated. Anyway, it's done now and ready for the nicer weather.