23-05-2018, 01:39 PM
Ruairidh, got in there before me re the rotating the plate on the back of the gear box, this has been done on my RN with a 4 speed box, the photo below shows the cable route although the final connection is just out of the photo. Also shows my cut and shut fly wheel cover.
Re filling the gear box I just un screw the gear leaver and fill from the top of the gear box, a lot easier than trying to unscrew the oil filler bolt.
IMG_6343 (002).jpg (Size: 48.38 KB / Downloads: 235)
Re filling the gear box I just un screw the gear leaver and fill from the top of the gear box, a lot easier than trying to unscrew the oil filler bolt.
